Lifting platform installation requirements

Update:15-11-2019
Summary:

1. In the early stage, the manufacturer shall provide t […]

1. In the early stage, the manufacturer shall provide the foundation drawing, after the pit is opened, the concrete shall be poured, and the lifting platform shall be embedded according to the drawing
The embedded parts are used as the foundation. The foundation surface shall be flat and drainage measures shall be taken.
2. The elevator installation personnel shall have a high sense of responsibility, technical quality and flexibility, and be organized by the manufacturer.
Of the personnel present for installation.
3. Prepare all tools and check the equipment and auxiliary devices before operation.
4. Clear the site and remove all obstacles to ensure the working space.